Design and Construction of the Third Set of Locks | ||||
---|---|---|---|---|
Table of Contents | ||||
Volumen I | ||||
Part 1
|
Instructions to Tenders | |||
Part 2
|
Tender Forms | |||
Part 3
|
Forms of Security | |||
A16Part 4
|
(Not Used)A16 | |||
Part 1
|
Locks Performance and Design Criteria
Locks Project Main Performance Requirements |
|||
Part 2
|
Supplemental Requirements
Locks Systems Performance Requirements |
|||
Part 3
|
General Requirements | |||
Part 4
|
Requirement Drawings | |||
Conditions of Contract | ||||
Employer’s Evaluation Criteria | ||||
General and Administrative | ||||
Part 1
|
Overall Execution Plan | |||
A16Part 2
|
Key PersonnelA16 | |||
A7Part 3
|
(Not Used)A7 | |||
Technical
|
||||
Part 4
|
Design-Build Execution Methodology | |||
Part 5
|
Design Plan | |||
Part 6
|
Construction Plan | |||
Part 7
|
A19Maintenance ServicesA19 | |||
Part 8
|
Training of ACP Personnel | |||
A7Part 9
|
Price ProposalA7 | |||
A16Volumen V
|
Contractor’s Proposal (Instructions)A16 | |||
General and Administrative | ||||
Part 1
|
Overall Execution Plan | |||
A16Part 2
|
Key PersonnelA16 | |||
A7Part 3
|
(Not Used)A7 | |||
Technical | ||||
Part 4
|
Design-Build Execution Methodology | |||
Part 5
|
Design Plan | |||
Part 6
|
Construction Plan | |||
Part 7
|
A19Maintenance ServicesA19 | |||
Part 8
|
Training of ACP Personnel | |||
A7Part 9
|
Price ProposalA7 | |||
Reference Douments | ||||
Part 1
|
Reference Drawings | |||
A7Part 2
|
Geotechinical Reports | |||
A16Part 3
|
Seismic Data for Temporary StructuresA16 | |||
Part 4
|
A11Environmental ReportsA11 | |||
Part 5
|
Conceptual Design of Post Panamax Locks (Pacific) (CPP, May 2003) | |||
Part 6
|
Update of Pacific Locks Conceptual Design and Harmonization of Atlantic Locks Conceptual Design (CPP, May 2005) | |||
Part 7
|
Hydrometeorological Report | |||
Part 8
|
A19Filling and Emptying Systems Reference DocumentsA19 | |||
Part 9
|
Handbook of Lockage Procedures (existing locks) | |||
Part 10
|
Blasting Records | |||
Part 11
|
Widening and Deepening of the Pacific Entrance and South Approach Channel to the Third Set of Locks of The Panama Canal (including drawings) | |||
Part 12
|
Feasibility Evaluation of a Tug Assisted Locks Vessel Positioning System | |||
Part 13
|
Tugboat Fleet Principal Particulars | |||
Part 14
|
A19Design [Specification and Drawings] for East Barrier Dam 2E, West Barrier Dam 1W and West Barrier Dam 2W StructuresA19 | |||
Part 15
|
Programa de Ampliación del Canal: Canal de Aproximación Norte Pacífico Proyecto No. PAC-2 (including drawings) | |||
A11Part 16
|
Electrical Works Reference DataA11 | |||
A11Part 17
|
Miraflores Swing Bridge Reference DocumentsA11 | |||
A16Part 18
|
Gatun Lake Dump Sites Bathymetric DataA16 | |||
A16Part 19
|
AdministrativeA16 | |||
A19Part 20
|
Traffic ScenariosA19 | |||
Employer’s Data | ||||
Part 1
|
Geotechnical Interpretive Report | |||
Part 2
|
Topographical Data | |||
Part 3
|
Seismic Design Criteria Data:
Accelerations and Response Spectra |